Reference Customers

Reference Projects

Works on assembly of district heating in the settlement of Baroševac

Investor JP EPS, Branch of RP „Kolubara“ (delivery of pre-insulated pipes DN50-DN200 - 10 km, accompanying valves and equipment; delivery and installation of a system for monitoring the appearance of moisture in the pre-insulated district heating pipeline)

 

Construction of district heating pipeline for shutdown of KO Ljutica Bogdan in the part from Dobropoljska street to Milutina Ivkovića street

Investor of JKP Beogradske elektrana, (delivery of pre-insulated pipes DN50-DN350 - 3.8km, accompanying valves and equipment, mechanical foaming of joints)

 

Construction of the new district heating pipeline of the Main route III from TENT A to the settlement „Potića voće“ in Obrenovac, the primary route of the eastern main route TP and the consumption of TP 25B

Investor JKP TOPLOVOD Obrenovac, (delivery of pre-insulated pipes DN100-DN700 – 10.5 km, accompanying valves and equipment, assembly of electro-welded joints and mechanical foaming of joints)

 

Reconstruction of district heating pipeline from TO „Sever“ to Bulevar oslobodenja street

(delivery of pre-insulated pipes 500 - 1.5 km, accompanying fittings and equipment)

 

Reconstruction of district heating system in the Municipality of Temerin

Investor PUK Temerin

 

Replacement of evaporators from a height of 4 m to a height of 72.5 m, DeNOx burners with cages, channel reconstruction. Replacement of the steam pipeline RA line-220 t, block B1, Replacement of the suspension of the pipeline of the RL line, Replacement of the superheater 4 inlet and outlet collectors P4 and suspension pipes P4, Replacement of the connecting pipeline MP1-MP2 and MP2-MP3, replacement of the connecting pipeline evaporator 2 separator, Replacement of the separator with connecting pipes, replacement of the starter bottle...

Investor JP EPS (execution of scaffolding, thermal insulation, fireclay and mechanical assembly works)

 

Overhaul and ongoing maintenance of boiler pipe systems and welding work at other auxiliary facilities of power plants of the TENT Branch (TENT A, TENT B, TE Morava and TE Kolubara), Overhaul and ongoing maintenance of boiler pipe systems and welding works at other auxiliary facilities of power plants of the TENT Branch (TENT A, TENT B, TE Morava and TE Kolubara)

Investor JP EPS (performance of mechanical assembly works)

 

Ongoing maintenance of TENT A1-A6 mills

Investor JP EPS (performance of mechanical assembly works)

 

Thermal insulation and scaffolding works - repairs and ongoing maintenance

Investor JP EPS (execution of scaffolding and thermal insulation works)

 

Replacement of relief rings and thermal insulation of all 8 reci-channels with suspension reconstruction on block B1

Investor JP EPS (execution of scaffolding, thermal insulation, fireclay and mechanical assembly works)

 

Refractory work on boilers

Investor JP EPS (performance of fireclay works)

 